draft-garg-auto-delete-unused-te-tunnels
Auto-Deletion of Unused TE Tunnels Using a Timer-Based Mechanism
This document describes a timer-based mechanism for handling unused
Traffic Engineering (TE) tunnels.
When a tunnel remains inactive for a configured period, it is moved
to a parked state, administratively shut down, and the associated
resources are released.
If the tunnel remains parked beyond a longer retention interval, it
may be deleted automatically or removed through operator action,
depending on local policy.
This approach improves resource utilization and provides a structured
lifecycle for unused TE tunnels.